Toronto
Riser backbone in base buildings, tenant fit-outs, MDF to IDF in occupied towers. Most of it runs after hours with the property manager.
- Toronto
- North York
- Scarborough
- Etobicoke
- East York
- York
Where we work
Crews out of the GTA every day, and the wider Golden Horseshoe on scheduled work. Same rates, same test reports and the same paperwork, whichever side of the 401 your site is on.
By region
The job changes with the region. A tower downtown and a distribution centre off the 410 need different cable, different access and a different shift.
Riser backbone in base buildings, tenant fit-outs, MDF to IDF in occupied towers. Most of it runs after hours with the property manager.
Warehouse and distribution backbone, armoured runs over racking, campus links through the airport corridor. Lift work and night shifts are normal here.
Office and light industrial parks off Highway 7 and the 404. Server room fiber, multi-building sites and a lot of singlemode between units.
Manufacturing plants and outside plant between buildings. Plant floor runs where copper keeps failing next to drives and welders.
Logistics yards, municipal and institutional sites. Gatehouse and camera links that copper cannot reach, plus long yard runs in duct.
Scheduled project work. Heavier industrial sites, longer outside plant runs, and multi-site rollouts booked a week or two out.
Same list everywhere
Nothing on this list is restricted to Toronto. The only thing that changes further out is how far ahead it gets booked.

Distance
Rates and standards do not change with distance. Scheduling does. Here is what to expect from each band.
Band 1
Toronto, Peel, York, Halton and Durham.
Band 2
Hamilton, Niagara, Waterloo Region, Guelph, Barrie and Peterborough.
Band 3
London, Windsor, Kingston, Ottawa and the north.
Site types
Getting on site
Free site survey, fixed quote within 48 hours.